Method and apparatus for determining packet transmission time using power gain due to packet transmission delay

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9924459
SERIAL NO

14843383

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of determining a transmission time of a packet in a mobile device according to the present disclosure may include: if a request for the transmission of a present packet from at least one operated application is detected, identifying whether it is possible to delay a transmission time of the present packet; when it is possible to delay the transmission time of the present packet, calculating a power gain generated as the transmission time of the present packet is delayed; and determining whether the transmission time of the present packet will be delayed according to the calculated power gain.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDSUWON-SI GYEONGGI-DO 16677
SEOUL NATIONAL UNIVERSITY R&DB FOUNDATION1 GWANAK-RO GWANAK-GU SEOUL 08826

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Seongsoo Seoul, KR 5 7
Hong, Young-Ki Seoul, KR 53 295
Huh, Sungju Seoul, KR 1 1
Lee, Ok-Seon Suwon-si, KR 55 1020
Park, Daedong Seoul, KR 9 11
Park, Yong-Seok Seoul, KR 104 1249

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00