Asymmetric TDD in flexible use spectrum

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9923709
APP PUB NO 20170230166A1
SERIAL NO

15493762

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method according to an embodiment of the invention includes receiving and transmitting signals over an asymmetric time division duplex (TDD) communication path. Signals are sent over the asymmetric TDD communication path via a first portion of a first frequency band. The first frequency band is adjacent to a second frequency band and to a third frequency band. The first frequency band is different from the second frequency band and from the third frequency band. A synchronous time division duplex (TDD) communication path can be operable in the second frequency band. A frequency division duplex (FDD) communication path can be operable in the third frequency band. Signals are received over the asymmetric TDD communication path via a second portion of the first frequency band that is different from the first portion of the first frequency band.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DBSD SERVICES LTD9601 S MERIDIAN BLVD LEGAL DEPT ENGLEWOOD CO 80112

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corea, Peter Alexandria, US 11 70
Hyslop, Doug Vienna, US 11 70
Peters, Tom McLean, US 12 93
Sorond, Mariam Reston, US 58 164

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00