Integrated circuit for retransmission control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9923675
SERIAL NO

15491731

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a terminal device that is capable of improving the characteristics of a response signal having poor transmission characteristics when ARQ is utilized in communication using an uplink unit band and a plurality of downlink unit bands associated with the uplink unit band. At the time of channel selection, a control unit selects a resource used in sending a response signal from among specific PUCCH resources notified in advance from a base station and PUCCH resources mapped to a CCE, and controls the transmission of the response signal. A response signal generating unit supports implicit signaling with respect to any given response signal, and at the same time as supporting LTE fallback from 2CC, uses a mapping method that, between bits, smooths the number of PUCCH resources that can determine ACK/NACK simply by determining the PUCCH resource regarding which the response signal had notified.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUN PATENT TRUSTNEW YORK NY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakao, Seigo Singapore, SG 689 4611
Oizumi, Toru Kanagawa, JP 126 757

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00