Stator of linear compressor and fixing method thereof, linear motor, and linear compressor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9923441
SERIAL NO

14603111

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one aspect of the present invention, a stator of a linear compressor comprises first stator pieces that are circumferentially and sequentially arranged about an axial direction and are radially disposed, second stator pieces that are provided between outer parts of the adjacent first stator pieces, and an outer side, away from a motor axis, of the second stator pieces assembled at an outer circumference of the stator. The stator can reduce the magnetic losses of the stator caused by the gap, and improve the efficiency of the motor. It can also improve the performance, stability, durability and reliability of the linear compressor. It can also reduce the bulk of the linear compressor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAIER GROUP CORPORATION266101 HAIER INDUSTRIAL PARK 1 HAIER ROAD QINGDAO HI TECH INDUSTRIAL PARK SHANDONG QINGDAO CITY A FOLK ART FORM POPULAR IN SHANDONG 266101
QINGDAO HAIER JOINT STOCK CO LTD266101 HAIER INDUSTRIAL PARK 1 HAIER ROAD LAOSHAN DISTRICT SHANDONG QINGDAO QINGDAO CITY SHANDONG PROVINCE 266101
HAIER GROUP TECHNIQUE R&D CENTERQINGDAO SHANDONG 266101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Hyeomgkook Shandong, CN 1 0
Li, Biao Shandong, CN 87 320
Song, Bin Shandong, CN 43 163
Xu, Sheng Shandong, CN 294 1874
Yan, Saina Shandong, CN 1 0
Zhao, Zhiqiang Shandong, CN 142 405

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00