Method and a system for a fast bus transfer in an electrical power system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9923375
SERIAL NO

14676517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for synchronizing and connecting a first sub power system with a second sub power system with an intelligent electronic device (IED) by use of at least one switching device between the first sub power system and the second sub power system in an electrical power system is provided. The IED monitors power supply parameters such as voltage magnitude, phase and other derived parameters such as voltage and phase differences in the first sub power system and the second sub power system to identify at least one instance for fast bus transfer where the two sub systems have acceptable differences in magnitude and phase. The IED performs phase shifting and voltage magnitude correction in anticipation for synchronizing power supplies on connection at the identified instance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 BADEN CH-5400

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ganesan, Sethuraman Bangalore, IN 3 17
Lade, Gajanan Latur, IN 1 4
Radhakrishnan, Rahul Kerala, IN 7 14
Talluri, Anil Bangalore, IN 5 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00