Methods of graphene growth and related structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9923142
SERIAL NO

15169557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and structure for providing uniform, large-area graphene by way of a transfer-free, direct-growth process. In some embodiments, a SAM is used as a carbon source for direct graphene synthesis on a substrate. For example, a SAM is formed on an insulating surface, and a metal layer is formed over the SAM. The metal layer may serve as a catalytic metal, whereby the SAM is converted to graphene following an annealing process. The SAM is deposited using a VPD process (e.g., an ALD process and/or an MLD process). In some embodiments, a CNT having a controlled diameter may be formed on the surface of a nanorod by appropriately tuning the geometry of the nanorod. Additionally, in some embodiments, a curved graphene transistor may be formed over a curved oxide surface, thereby providing a band gap in a channel region of the graphene transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD8 LI-HSIN RD 6 HSINCHU SCIENCE PARK HSINCHU 300-78

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Miin-Jang Taipei, TW 66 230
Hsieh, Chung-Yen Taipei, TW 5 10
Pan, Samuel C Hsinchu, TW 76 598

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00