Semiconductor device and method of forming package-on-package structure electrically interconnected through TSV in WLCSP

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922955
SERIAL NO

12717335

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor wafer has a plurality of semiconductor die. First and second conductive layers are formed over opposing surfaces of the semiconductor die, respectively. Each semiconductor die constitutes a WLCSP. A TSV is formed through the WLCSP. A semiconductor component is mounted to the WLCSP. The first semiconductor component is electrically connected to the first conductive layer. A first bump is formed over the first conductive layer, and a second bump is formed over the second conductive layer. An encapsulant is deposited over the first bump and first semiconductor component. A second semiconductor component is mounted to the first bump. The second semiconductor component is electrically connected to the first semiconductor component and WLCSP through the first bump and TSV. A third semiconductor component is mounted to the first semiconductor component, and a fourth semiconductor component is mounted to the third semiconductor component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JCET SEMICONDUCTOR (SHAOXING) CO LTDNO 500 LINJIANG ROAD YUECHENG DISTRICT SHAOXING

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Camacho, Zigmund R Singapore, SG 60 1745
Merilo, Dioscoro A Singapore, SG 61 1616
Tay, Lionel Chien Hui Singapore, SG 116 1805

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00