Bump-on-lead flip chip interconnection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922915
SERIAL NO

13965356

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a semiconductor die with a plurality of bumps formed over the die. A substrate has a plurality of conductive traces formed on the substrate. Each trace has an interconnect site for mating to the bumps. The interconnect sites have parallel edges along a length of the conductive traces under the bumps from a plan view for increasing escape routing density. The bumps have a noncollapsible portion for attaching to a contact pad on the die and fusible portion for attaching to the interconnect site. [The fusible portion melts at a temperature which avoids damage to the substrate during reflow.] The noncollapsible portion includes lead solder, and fusible portion includes eutectic solder. The interconnect sites have a width which is less than 1.2 times a width of the conductive trace. Alternatively, the interconnect sites have a width which is less than one-half a diameter of the bump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STATS CHIPPAC PTE LTD5 YISHUN STREET 23 SINGAPORE 768442

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pendse, Rajendra D Fremont, US 164 3001

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00