Method for transferring a useful layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922867
SERIAL NO

15018465

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for transferring a useful layer onto a carrier substrate comprises formation of an embrittlement plane by implantation of light species into a first substrate in such a manner as to define the bounds of a useful layer between the plane and a surface of the first substrate, mounting of the carrier substrate onto a surface of the first substrate so as to form an assembly to be fractured, and thermal fracture treatment of the first substrate along the embrittlement plane in such a manner as to transfer the useful layer onto a support. During the thermal fracture treatment, the degree of peripheral adhesion is reduced at an interface between the carrier substrate and the first substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOITECPARC TECHNOLOGIQUE DES FONTAINES CHEMIN DES FRANQUES BERNIN 38190

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben, Mohamed Nadia Echirolles, FR 36 131
Kononchuk, Oleg Grenoble, FR 89 317
Landru, Didier Champ Pres Froges, FR 72 782

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00