Multi-block sputtering target and associated methods and articles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922808
SERIAL NO

15067358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sputtering target that includes at least two consolidated blocks, each block including an alloy including molybdenum in an amount greater than about 30 percent by weight and at least one additional alloying ingredient; and a joint between the at least two consolidated blocks, the joint being free of any microstructure due to an added bonding agent (e.g., powder, foil or otherwise), and being essentially free of any visible joint line the target that is greater than about 200 μm width (e.g., less than about 50 μm width). A process for making the target includes hot isostatically pressing, below a temperature of 1080° C., consolidated perform blocks that may be surface prepared (e.g., roughened to a predetermined roughness value) prior to pressing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
H C STARCK SOLUTIONS EUCLID LLC21801 TUNGSTEN ROAD EUCLID OH 44117-1117

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gaydos, Mark E Nashua, US 20 149
Rozak, Gary Alan Akron, US 20 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00