Powder for powder magnetic core, and powder magnetic core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922758
SERIAL NO

14406288

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A powder for a powder magnetic core, being composed of iron-base soft magnetic powder particles which each have a phosphoric acid-based chemical conversion coating on the surface. In this powder, the maximum thickness of the phosphoric acid-based chemical conversion coating is 20 to 200 nm, and recessed portions are formed on the surface of the chemical conversion coating with the total area of openings of the recessed portions being 0.5 to 50% by area relative to the total area of the observation visual fields, as determined by observing ten or more parts of the surface of the phosphoric acid-based chemical conversion coating through a scanning electron microscope with a magnification of 10000× or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL LTD )2-4 WAKINOHAMA-KAIGANDORI 2-CHOME CHUO-KU KOBE-SHI HYOGO 6518585 JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hojo, Hirofumi Takasago, JP 13 65
Hosokawa, Mamoru Kobe, JP 17 35
Kamijo, Tomotsuna Takasago, JP 6 19
Takeda, Mikako Kobe, JP 29 282
Urushihara, Wataru Kobe, JP 23 233

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00