Nuclear power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9922740
SERIAL NO

14437897

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear power generation system and related power cycle are disclosed, in one embodiment, the system includes primary coolant circulation through a hydraulically interconnected reactor containing nuclear fuel and a steam generating vessel collectively defining a steam supply system. Liquid secondary coolant for the power cycle flows through the steam generating vessel and is converted to steam by the primary coolant to drive a low pressure turbine of a turbine-generator set. Steam exiting the turbine is condensed and heated prior to return to the steam supply system, thereby completing a secondary coolant flow loop. In one embodiment, a majority of the secondary coolant heating occurs within the steam generating vessel via heat exchange with the primary coolant rather than externally in the secondary coolant flow loop. This creates a temperature differential between the primary and secondary coolant sufficient to create natural thermally induced convective circulation of the primary coolant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SMR LLC1001 N US HIGHWAY 1 JUPITER FL 33477

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rajkumar, Joseph Cherry Hill, US 40 206
Singh, Krishna P Hobe Sound, US 264 2861

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00