Staging operation unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9921603
SERIAL NO

14191796

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A staging operation unit has a base member having a convex portion, a rotary member, a bearing member fixed on the convex portion that rotatably mounts the rotary member thereon with respect to the base member, and an accessory. The rotary member has a pushed-in movable member that accepts a push-in operation in a direction along a rotation axis of the bearing member, a rotary operation detection unit that detects rotation of the rotary member and outputs a signal corresponding to a result of the detection of the rotation to outside, and a push-in operation detection unit that detects the push-in operation of the pushed-in movable member and outputs a signal corresponding to a result of the detection of the push-in operation to outside. At least a part of the accessory is housed inside the convex portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OMRON CORPORATION801 MINAMIFUDODO-CHO HORIKAWAHIGASHIIRU SHIOKOJI-DORI SHIMOGYO-KU KYOTO-SHI KYOTO 600-8530

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuta, Takehiko Gifu, JP 3 9
Ono, Takahiro Aichi, JP 136 443

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00