Compact optical transceiver by hybrid multichip integration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9921379
SERIAL NO

15481994

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compact optical transceiver formed by hybrid multichip integration. The optical transceiver includes a Si-photonics chip attached on a PCB. Additionally, the optical transceiver includes a first TSV interposer and a second TSV interposer separately attached nearby the Si-photonics chip on the PCB. Furthermore, the optical transceiver includes a driver chip flip-bonded partially on the Si-photonics chip through a first sets of bumps and partially on the first TSV interposer through a second sets of bumps. Moreover, the optical transceiver includes a transimpedance amplifier module chip flip-bonded partially on the Si-photonics chip through a third sets of bumps and partially on the second TSV interposer through a fourth set of bumps.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ASIA PTE LTDSINGAPORE SINGAPORE CITY SINGAPORE CITY SINGAPORE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coccioli, Roberto Westlake Village, US 28 498
Ding, Liang Singapore, SG 107 549
Nagarajan, Radhakrishnan L Santa Clara, US 259 2850

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00