Pumping block device having an integrated bypass circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920885
SERIAL NO

14907559

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to a multiphase pumping block device comprising a pump and a bypass circuit. Said bypass circuit is suitable for enabling the flow of a fluid from an area upstream of the pump to an area downstream of the pump by bypassing the pump. The latter comprises at least out non-return valve suitable for blocking the flow of the fluid from the area downstream of the pump to the area upstream of the pump. In addition, the pumping block device is connected to a set of pumping circuits, comprising a main bypass circuit suitable for enabling the flow of a fluid from an area upstream of the connected pumping block to an area downstream of the connected pumping block. Finally, the pumping block device is arranged in order to be disconnected from said set of circuits for maintenance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOTALENERGIES ONETECHLA DÉFENSE 6 2 PLACE JEAN MILLIER 92400 COURBEVOIE 92400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bibet, Pierre-Jean Pau, FR 2 3
Le, Rodallec Jean-Luc Pau, FR 2 3
Saincry, Olivier Pau, FR 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00