Rotary pump with a plastic composite structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920756
SERIAL NO

14622996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotary pump including: a housing having an inlet and an outlet for a fluid, and a delivery chamber connected to the inlet and outlet; a delivery rotor rotatable in the delivery chamber about a rotational axis has a structure which is central in relation to the rotational axis; and a setting structure surrounding the delivery rotor and with the delivery rotor forms delivery cells, delivering the fluid from the inlet to the outlet, can be moved back and forth relative to the delivery rotor, in order to adjust a delivery volume of the rotary pump. At least one of the setting structure and/or the rotor structure is a material composite structure including a molded region made of plastic and a functional region which is fixedly connected to the molded region and made of a functional material which has a different chemical composition to the plastic of the molded region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHWABISCHE HUTTENWERKE AUTOMOTIVE GMBHWILHELMSTR 67 AALEN-WASSERALFINGEN 73433

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Merk, Klaus Bad Wurzach, DE 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00