Multi-nozzle flow diverter for jet engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920710
APP PUB NO 20140345253A1
SERIAL NO

13888967

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exhaust system for a variable cycle aircraft engine. The exhaust system comprises a core exhaust for bypass air and hot gases of combustion. The core exhaust includes a convergent-divergent nozzle. The convergent-divergent nozzle is formed from a plurality of flaps and seals. The exhaust system comprises a third air duct for a third stream of air. The third stream of air is selectively exhausted from the third duct through a secondary nozzle or divergent slots in the convergent-divergent nozzle, or both depending upon the flight mode. A diverter valve is positioned in the third stream duct to selectively control the flow of third stream air through the secondary nozzle, the divergent slots and combinations thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dawson, David Lynn Liberty Township, US 3 48
Ellerhorst, Robert Jerome Cincinnati, US 2 45
Lariviere, Erin Lee Milford, US 3 55
Petersen, Brian Joseph Mason, US 2 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00