Hybrid wave rotor propulsion system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920689
SERIAL NO

14211140

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid propulsion system includes a wave rotor combustion engine operating in parallel with an electrical motor-generator element. The motor-generator element is coupled to the turbine shaft to selectively drive or be driven by the turbine shaft. In one mode of operation, the motor of the motor generator element is powered by a battery to provide rotational energy to the turbine shaft. In another mode of operation, the wave rotor combustion engine drives the generator to recharge the battery. The wave rotor combustion engine may be further directly coupled to auxiliary components without a gearbox to drive the components at substantially the same speed as the turbine shaft. The turbine rotor of the combustion engine includes a plurality of chambers defined by circumferentially spaced curved vanes that improves specific fuel consumption for the engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDIANA UNIVERSITY RESEARCH & TECHNOLOGY CORPORATION351 W 10TH STREET INDIANAPOLIS IN 46202

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nalim, M Razi Indianapolis, US 3 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00