Methods of processing lignocellulosic biomass using single-stage autohydrolysis pretreatment and enzymatic hydrolysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920345
APP PUB NO 20160160253A1
SERIAL NO

14908913

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of processing lignocellulosic biomass to fermentable sugars are provided which rely on hydrothermal pretreatment. Soft lignocellulosic biomass feedstock is pretreated in a single-stage pressurized hydrothermal pretreatment to very low severity. The pre-treated biomass is hydrolysed, typically as a whole slurry, using enzymatic hydrolysis catalysed by an enzyme mixture comprising endoglucanase, exoglucanase, β-glucosidase, endoxylanase, and β-xylosidase activities at activity levels in nkat/g glucan of endoglucanase of at least 1100, exoglucanase of at least 280, β-glucosidase of at least 3000, endoxylanase of at least 1400, and β-xylosidase of at least 75, so as to produce a hydrolysate in which the yield of C5 monomers is at least 55% of the original xylose and arabinose content of the feedstock prior to pretreatment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INBICON A/S

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeppesen, Martin Dan Odense V, DK 11 17
Larsen, Jan Tommerup, DK 49 302
Mogensen, Kit Kellebjerg Fredericia, DK 6 23
Poulsen, Niels Nielsen Vojens, DK 10 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00