Method for producing aniline derivative by fermentation from carbon source

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920343
SERIAL NO

15265123

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method for producing an aniline derivative by fermentation from a carbon source such as glucose. The method comprises the following steps: production of microorganisms capable of producing 1.8 g/L or more of 4-aminophenylalanine (4APhe) under prescribed culture conditions by introducing at least three exogenous genes into microorganisms having the ability to biosynthesize 4-aminophenylpyruvic acid from chorismic acid; and production of at least one aniline derivative selected from the group consisting of 4-aminophenylalanine (4APhe), 4-aminocinnamic acid (4ACA), 2-(4-aminophenyl)aldehyde, 4-aminophenylacetic acid, and 4-aminophenethylethanol (4APE) by bringing these microorganisms into contact with a carbon source under conditions suited to the growth and/or maintenance of these microorganisms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN SCIENCE AND TECHNOLOGY AGENCYSAITAMA PREFECTURE JAPAN SAITAMA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Konishi, Kazunobu Okayama, JP 59 233
Masuo, Shunsuke Ibaraki, JP 3 3
Takaya, Naoki Ibaraki, JP 12 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00