Process for production of halosilanes from silicon-containing ternary intermetallic compounds

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920079
SERIAL NO

15503462

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing a reaction product including a halosilane includes: contacting an unsaturated hydrocarbyl halide and a ternary intermetallic compound at a temperature of 300° C. to 700° C. to form the reaction product. The ternary intermetallic compound includes copper, silicon and a transition metal. The halosilane in the reaction product has formula R1mR2n—HoSiX(4−m−n−o)> where each R1 is independently a saturated monovalent hydrocarbyl group, each R2 is independently an unsaturated monovalent hydrocarbyl group; each X is independently a halogen atom; subscript m is 1, 2, or 3; subscript n is 0, 1, or 2; subscript o is 0, 1, or 2; and a quantity (m+n+o) is 1, 2, or 3. At least a portion of the unsaturated hydrocarbyl groups in the unsaturated hydrocarbyl halide are converted to saturated hydrocarbyl groups (R1) in the halosilane.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOW SILICONES CORPORATION2200 WEST SALZBURG ROAD MIDLAND MI 48686-0994

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katsoulis, Dimitris Midland, US 34 118
Roberts, John Midland, US 156 3252

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00