Method for controlling diameter of GRIN lens fiber and fiber drawing equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9919947
SERIAL NO

13257482

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When a GRIN lens fiber is drawn from a preform, control of a fiber diameter is improved in order to increase a production yield of the GRIN lens fiber having a fiber diameter within a desired range. The problem is solved by controlling the drawing speed using a fiber diameter c, which is obtained by correcting a fiber diameter a using the fiber diameter b and a fiber diameter α. The fiber diameter a is measured using a diameter measuring instrument A that measures an outer diameter of the GRIN lens fiber, which is being elongated inside a heating furnace, the fiber diameter b is measured using a diameter measuring instrument B that measures an outer diameter of the GRIN lens fiber outside the heating furnace, and the fiber diameter α is a value of the fiber diameter a measured a specified period of time T earlier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO SEIKAN GROUP HOLDINGS LTD18-1 HIGASHI-GOTANDA 2-CHOME SHINAGAWA-KU TOKYO 1418627 ?1418627

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Toshiaki Kanagawa, JP 7 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00