Regenerative braking feedback display and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9919693
SERIAL NO

13344963

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Driver braking performance feedback may be conveyed to a vehicle operator as a braking efficiency score using a vehicle display system. The display system may include a vehicle display for displaying a braking efficiency indicator or gauge corresponding to the braking efficiency score. The braking efficiency score may be based on a comparison of the total regenerative braking energy recaptured during at least one braking event to a either a maximum amount of braking energy that may be recaptured during the at least one braking event or an actual total braking energy expended during the at least one braking event. The braking efficiency score may be displayed upon the completion of a braking event or upon a completion of a trip including a plurality of braking events. The display may also convey a distance corresponding to a portion of a trip distance achieved through regenerative braking.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC1 AMERICAN RD FL4 DEARBORN MI 48126-2701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aldighieri, Paul Grosse Pointe Farms, US 31 909
Crombez, Dale Scott Livonia, US 104 1588
Gilman, Dale Beverly Hills, US 28 1158
Greenberg, Jeffrey Allen Ann Arbor, US 28 589
Ochocinski, Christopher Adam Canton, US 31 450
Skaff, Ryan Farmington Hills, US 23 430
Watson, David L Ann Arbor, US 12 269

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00