Electroextraction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9919317
SERIAL NO

14394895

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a process for the extraction of analyte compounds from a sample comprising one or more analytes in a donor phase into an acceptor phase, comprising the steps of: a) providing an electrically conductive donor phase comprising the compounds in a first electrically conductive solvent or solvent blend, and an electrode arranged in electrically conductive contact with the donor phase, b) providing an electrically conductive acceptor phase in electrically conductive contact with a second electrode; and c) providing an insulator phase in fluid communication with at least one of the donor phase and the acceptor phase, wherein the insulator phase is immiscible with the donor phase and/or the acceptor phase, and d) (d) applying an electrical field between the first and the second electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITEIT LEIDEN2311 EZ LEIDEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hankemeier, Thomas RA Leiden, NL 16 35
Lindenburg, Peter CC Leiden, NL 3 4
Raterink, Robert-Jan CC Leiden, NL 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00