Needle-shaped body and method for manufacturing needle-shaped body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9919141
APP PUB NO 20150112283A1
SERIAL NO

14579490

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a needle-shaped body, including supplying a first aqueous solution to an intaglio plate, supplying a second aqueous solution to the intaglio plate, drying the first and second aqueous solutions in the intaglio plate such that a dried body is formed on the intaglio plate, and separating the dried body from the intaglio plate such that a needle-shaped body including a needle-shaped projection and a support base which supports the needle-shaped projection is obtained. The intaglio plate includes a recess corresponding to the needle-shaped projection, the first aqueous solution is supplied to fill at least a portion of the recess, the first aqueous solution and the second aqueous solution are immiscible, the first aqueous solution forms a projection side layer in the needle-shaped body, and the second aqueous solution forms a support base side layer on the projection side layer in the needle-shaped body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOPPAN PRINTING CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Hiroyuki Taito-ku, JP 407 3482
Tagami, Hanae Taito-ku, JP 8 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00