Electrogram-based ablation control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9918788
APP PUB NO 20140121659A1
SERIAL NO

13665287

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, devices, and systems for predicting, diagnosing, and preventing adverse events during an ablation procedure are described. A method for providing ablation energy includes receiving a first signal based on biological activity of a tissue of a patient. The method further includes analyzing the first signal to yield a first data set, establishing a threshold parameter according to the first data set, and providing ablation energy for the ablation of a biological site.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ST JUDE MEDICAL ATRIAL FIBRILLATION DIVISION INCONE ST JUDE MEDICAL DRIVE ST PAUL MN 55117

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byrd, Charles Bryan Oakdale, US 22 1550
Holte, James Minneapolis, US 1 290
Kuehn, Mick Maple Grove, US 1 290
Pacheco, Robert Minneapolis, US 21 1114
Pasvogel, Matt Blaine, US 1 290
Paul, Saurav Minneapolis, US 121 8199
Shai, Yitzhak Springfield, US 1 290
Tegg, Troy Elk River, US 25 812

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00