Hydrocarbon-operable fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9917318
SERIAL NO

14765605

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an energy generation apparatus (1), in particular for use in a vehicle, which can be operated using hydrocarbons such as diesel and the like, which comprises a fuel cell (2) and is provided with connections (3, 4, 5) for introduction of air and the hydrocarbons and for the output of electric energy. According to the invention, the energy generation apparatus has three essentially physically separate functional units (7, 8, 9), where the first functional unit (7) is configured as a supply device for media and has essentially devices for introduction of fuel and air, a second functional unit (8) is configured for reforming and has essentially devices for converting the hydrocarbons into process gas and a third functional unit (9) is configured for generation of electric energy and has essentially the fuel cell (2), where the process gas produced in the second functional unit (8) is fed to the third functional unit (9).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVL LIST GMBHHANS-LIST-PLATZ 1 GRAZ 8020

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kliment, Arthur Steyr, AT 1 1
Rechberger, Juergen Graz, AT 6 11
Reissig, Michael Graz, AT 7 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00