Composite substrate, production method thereof, and acoustic wave device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9917246
APP PUB NO 20150280107A1
SERIAL NO

14737655

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite substrate production method of the invention includes (a) a step of mirror polishing a substrate stack having a diameter of 4 inch or more, the substrate stack including a piezoelectric substrate and a support substrate bonded to each other, the mirror polishing being performed on the piezoelectric substrate side until the thickness of the piezoelectric substrate reaches 3 μm or less; (b) a step of creating data of the distribution of the thickness of the mirror-polished piezoelectric substrate; and (c) a step of performing machining with an ion beam machine based on the data of the thickness distribution so as to produce a composite substrate have some special technical features.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NGK INSULATORS LTDJAPAN'S AICHI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hori, Yuji Owariasahi, JP 128 1548
Ikejiri, Mitsuo Inuyama, JP 2 4
Tai, Tomoyoshi Inazawa, JP 57 806

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00