Oxide semiconductor thin film, thin film transistor, manufacturing method and device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9917205
SERIAL NO

15123177

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure discloses an oxide semiconductor thin film, a thin film transistor, a manufacturing method and a device, belonging to the field of flat panel display. The oxide semiconductor thin film is made of an oxide containing zirconium and indium. A method of manufacturing the oxide semiconductor thin film comprises preparing a target using the oxide containing zirconium and indium, and sputtering the target to obtain the oxide semiconductor thin film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTD100015 NO 10 JIUXIANQIAO ROAD BEIJING CHAOYANG DISTRICT BEIJING CITY BEIJING CITY 100015
SOUTH CHINA UNIVERSITY OF TECHNOLOGY510635 WUSHAN ROAD TIANHE DISTRICT GUANGZHOU CITY GUANGDONG PROVINCE GUANGZHOU CITY GUANGDONG PROVINCE 510635

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lan, Linfeng Beijing, CN 21 22
Peng, Junbiao Beijing, CN 26 28
Wang, Lei Beijing, CN 2386 21419
Xu, Xiaoguang Beijing, CN 23 48
Yan, Liangchen Beijing, CN 98 70
Yuan, Guangcai Beijing, CN 248 413

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00