EUV mirror and optical system comprising EUV mirror

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9915876
SERIAL NO

14796612

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An EUV mirror with a substrate and a multilayer arrangement including: a periodic first layer group having N1>1 first layer pairs of period thickness P1 and arranged on a radiation entrance side of the multilayer arrangement; a periodic second layer group having N2>1 second layer pairs of period thickness P2 and arranged between the first layer group and the substrate; and a third layer group having N3 third layer pairs arranged between the first and second layer groups. N1>N2. The third layer group has a third period thickness P3 which deviates from an average period thickness PM=(P1+P2)/2 by a period thickness difference ΔP. ΔP corresponds to the quotient of the optical layer thickness (λ/4) of a quarter-wave layer and the product of N3 and cos(AOIM), AOIM being the mean incidence angle for which the multilayer arrangement is designed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARL ZEISS SMT GMBHRUDOLF-EBER-STRASSE 2 OBERKOCHEN 73447

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Paul, Hans-Jochen Aalen, DE 17 94
Schicketanz, Thomas Aalen, DE 30 92
Zaczek, Christoph Heubach, DE 44 570

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00