Optical interconnection device and integrated optical device using bulk-silicon substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9915782
SERIAL NO

15355293

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical interconnection device including: a first element layer formed on a substrate; a second element layer disposed on the first element layer and receiving an optical signal; and a mode converter interposed between the first element layer and the second element layer, and eliminating a difference between an effective refractive index of the first element layer and an effective refractive index of the second element layer and match a mode profile, wherein the first element layer, the mode converter, and the second element layer are sequentially disposed on respective planes spaced apart from each other on the substrate, and one end of the mode converter overlaps a part of the second element layer, and the other end of the mode converter overlaps a part of the first element layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOOKMIN UNIVERSITY INDUSTRY-ACADEMIC COOPERATION FOUNDATION406 INNOVATION PARTNERSHIP BD KOOKMIN UNIVERSITY 77 JEONGNEUNG-RO SEONGBUK-GU SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Donghwan Yongin-si, KR 10 294
Bae, Yoonyoung Seoul, KR 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00