Combustion chamber assembly unit and method for construction of a combustion chamber assembly unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9915422
SERIAL NO

14840439

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion chamber assembly unit, especially for a vehicle heater, includes a combustion chamber housing (12) extending in the direction of a combustion chamber housing longitudinal axis (L), a support area (24) extending radially outwards in relation to the combustion chamber housing (12), a sealing element (33) with a first sealing area (34) on a first axial side of the support area (24) and a second sealing area (36) on a second axial side, opposite the first axial side, of the support area (24). A deformation connection area (42) connects the first sealing area (34) and the second sealing area (36) to one another and encloses the support area (24) in a circumferential section that is radially outwards.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EBERSPÄCHER CLIMATE CONTROL SYSTEMS GMBH73730 ESSLINGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haefner, Michael Stuttgart, DE 20 57
Krönninger, Stephan Waiblingen, DE 1 2
Wagner, Matthias Kirchheim, DE 157 2048
Weese, Matthias Korb, DE 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00