Gear transmission and usage measuring device for measuring usage of gear transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9915337
SERIAL NO

14722500

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A usage measuring device measures usage of a gear transmission. The usage measuring device is provided with an oscillation cycle measuring unit and a comparing unit. The oscillation cycle measuring unit measures an oscillation cycle of a state signal indicating at least one of a rotational state of an input unit side and a rotational state of an output unit side of the gear transmission. The comparing unit compares a first oscillation cycle measured during an initial operating period of the gear transmission, and a second oscillation cycle measured after the gear transmission has operated for a predetermined time. The oscillation cycle measuring unit measures the first oscillation cycle and the second oscillation cycle of the state signal after the gear transmission has stopped driving.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NABTESCO CORPORATION7-9 HIRAKAWACHO 2-CHOME CHIYODA-KU TOKYO 102-0093

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arita, Souichi Yamanashi-ken, JP 1 2
Matsubayashi, Masahiro Kobe, JP 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00