Engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9915213
SERIAL NO

15478660

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The objective of the present invention is to provide an engine with improved startability and stable operation regardless of the driving environment and usage conditions. The engine is equipped with a control means, which calculates a standard injection timing on the basis of the target rotational frequency of the engine and a standard injection amount, that is, the amount of fuel injected, and which corrects the standard injection timing using at least one correction amount. A fuel injection control unit calculates a cooling water correction amount on the basis of the target rotational frequency of the engine, the standard injection amount, and the cooling water temperature, and when the cooling water temperature is less than a first prescribed temperature the control unit corrects the standard injection timing using only the cooling water correction amount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YANMAR POWER TECHNOLOGY CO LTD1-32 CHAYAMACHI KITA-KU OSAKA 5308311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimoto, Yuki Osaka, JP 20 122
Fukuda, Tomohiro Osaka, JP 55 183
Iwase, Atsuhito Osaka, JP 5 7
Oku, Yasuaki Osaka, JP 2 2
Otani, Tomohiro Osaka, JP 33 273

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00