Control of system with gas based cycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9915177
SERIAL NO

14397806

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

System (2) for carrying out a gas based thermodynamic cycle in which a gas is compressed in at least one compressor (8) in one part of the cycle and is expanded in at least one expander (10) operating simultaneously in an upstream or downstream part of the cycle, wherein the change in absolute internal power with gas mass flow rate differs as between the compressor and the expander and wherein the system comprises a control system configured to make selective adjustments so as individually to control, either directly or indirectly, the respective gas mass flow rates through each of the compressor and expander. The system may be an energy storage system including a pumped heat energy storage system configured to provide independent graduated control of system pressure and output power by selective adjustment of the respective gas mass flow rates through each half-engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERGY TECHNOLOGIES INSTITUTE LLPLOUGHBOROUGH LEICESTERSHIRE LE11 3UZ

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Howes, Jonathan Sebastian Hampshire, GB 25 1221
Hunt, Rowland Geoffrey Hampshire, GB 7 311
Macnaghten, James Hampshire, GB 18 984

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00