Method for river/lake level regulation and water conservancy system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9915048
SERIAL NO

15039757

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for river/lake level regulation and a water conservancy system. The method for level regulation employs a non-closure mode; a water reservoir system is built on one side of a river/lake, water from the river/lake enters into the reservoir system when the water level of the river/lake exceeds a warning water level, and the river/lake is replenished with the water stored in the reservoir system when the water level of the river/lake is unduly low; the conservancy system, which employs the non-closure mode, is built on one side of a river/lake waterway and includes the water reservoir system and a first water passage, the water reservoir system communicates with the river/lake waterway through the first water passage. The method for river/lake level regulation and the water conservancy system realize river/lake level regulation during drought and flood periods without any river/lake closure, so that water resources are control effectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FENGHE YINGZAO GROUP INC7TH FLOOR CUILIN INTERNATIONAL BUILDING NO 1266 FENGHE MIDDLE AVENUE HONGGUTAN DISTRICT NANCHANG CITY JIANGXI PROVINCE 330000 NANCHANG CITY JIANGXI PROVINCE 330000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fu, Jie Nanchang, CN 179 2191
He, Daxin Nanchang, CN 2 11
Jie, Baoru Nanchang, CN 6 5
Jie, Jiangang Nanchang, CN 7 5
Li, Jue Nanchang, CN 18 95
Tao, Wujin Nanchang, CN 5 4
Zhou, Shuangxi Nanchang, CN 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00