Processes for producing a transportation fuel from a renewable feedstock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9914883
SERIAL NO

14677530

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Processes for the production of transportation fuel from a renewable feedstock. A gaseous mixture of carbon monoxide and hydrogen is used to deoxygenate and hydrogenate the glycerides to produce long chain hydrocarbons. The hydrocarbons may be isomerized to improve cold flow properties to provide a diesel fuel. Prior to isomerization, the long chain hydrocarbons can be separated or the separation can be after isomerization. Recycle gas streams from the isomerization and the deoxygenation and hydrogenation reactions may be used to supply at least a portion of the gaseous mixture of carbon monoxide and hydrogen. Synthesis gas may also be used to supply at least a portion of the gaseous mixture of carbon monoxide and hydrogen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UOP LLC25 EAST ALGONQUIN ROAD SUITE 2500 DES PLAINES IL 60017

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dutta, Kanchan Kolkata, IN 4 19
Kumar, Avnish Alwar, IN 17 68
Mani, Krishna Gurgaon, IN 22 60
Ray, Anjan New Delhi, IN 25 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00