Crude oil storage tank with electrostatic internals to dehydrate crude oil within a process train of a floating production storage and offloading installation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9914073
SERIAL NO

14977880

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process train for a floating production storage and offloading installation includes a crude oil storage tank that is equipped with at least one set of electrostatic internals arranged to provide a treatment flow path isolated from a surrounding volume of the electrostatic separator section of the tank. An oil-and-water stream or mixture entering the set of electrostatic internals travels along the treatment flow path and is subjected to an electric field. The treatment flow path is in an upwardly direction toward the oil outlet section and in a downwardly opposite direction toward the water outlet section of the tank. Employing electrostatic internals within the tank permits an allowable inlet water content into the tank of up to 80%, significantly reducing the required topside processing equipment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAMERON SOLUTIONS INC1333 WEST LOOP SOUTH SUITE 1700 HOUSTON TX 77027

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caires, Fernandez Luis Eduardo Cypress, US 9 26
Mandewalkar, S Pavankumar B Houston, US 16 42
Sams, Gary W Spring, US 83 455
Sprenkel, Marcus D Houston, US 14 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00