Air mattress and method of constructing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9913548
SERIAL NO

15500515

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of constructing a mattress includes placing a first ribbon about a perimeter surface of a foam member. The first ribbon includes a top lip and a bottom lip. A second ribbon is placed about a perimeter surface of the first ribbon. A third ribbon is placed about a perimeter surface of the second ribbon. The top lip of the first ribbon is folded over the top surface of the second ribbon. The bottom lip of the first ribbon is folded over the bottom surface of the second ribbon. A first fabric panel is bonded to the top surface of the first foam member and to the top lip of the first ribbon. A second fabric panel is bonded to the bottom surface of the first foam member and to the bottom lip of the first ribbon.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CASCADE DESIGNS INC4000 1ST AVENUE SOUTH SEATTLE WA 98134

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jacot, Douglas S Kingston, US 13 17
Marson, James Edward Seattle, US 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00