Metering of product in an air cart on hilly terrain

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9913424
SERIAL NO

15422926

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air cart for an agricultural air seeding system includes a frame; at least one tank for holding a material, and a metering system associated with the at least one tank. The metering system is configured for metering the material from the at least one tank at an output rate. A sensor senses a parameter associated with an angular orientation of the air cart relative to a reference plane, and provides an output signal indicative of the angular orientation. An actuator adjusts an output rate of the metering system and moves at least one of the at least one tank and the metering system relative to the frame. A controller is coupled with each of the actuator and the sensor and receives the output signal from the sensor. The controller is configured for controlling the actuator and adjusting the output rate of the metering system, dependent upon the output signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CNH INDUSTRIAL CANADA LTD1000 71ST STREET EAST P O BOX 1928 SASKATOON SK S7K 3S5

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Henry, James W Saskatoon, CA 151 1270

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00