Apparatus and method for measuring position

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9913093
SERIAL NO

15355740

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus of a user equipment (UE) for supporting a higher data rate than a 4G communication system is provided. The apparatus includes a transceiver and a processor operatively coupled with the transceiver. The processor is configured to broadcast a request signal for positioning the UE, receive response signals corresponding to the request signal from a plurality of UEs, based on received signal timings of the response signals and timing advance (TA) values of the plurality of UEs, select one of at least one UE set which is classified based on a distance from the UE, select three UEs from the selected set based on the TA values such that a triangular area comprising the three UEs as vertices covers the UE, and generate position information of the UE based on distances between the three UEs and the UE.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO
RESEARCH & BUSINESS FOUNDATION SUNGKYUNKWAN UNIVERSITYCORPORATE COLLABORATION CENTER SUNGKYUNKWAN UNIVERSITY 2066 SEOBU-RO JANGAN-GU GYEONGGI-DO SUWON-SI 16419

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Hyung-Jin Seoul, KR 38 383
Hwang, Wonjun Suwon-si, KR 43 364
Jang, Min Seongnam-si, KR 133 1089
Kim, Han Jun Seoul, KR 36 78
Lee, Dong Hun Gwacheon-si, KR 300 1649
Lee, Kyunghoon Suwon-si, KR 85 990
Ryu, Hyunseok Yongin-si, KR 347 2487

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00