Thyristor starting device and control method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9912259
SERIAL NO

14765420

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thyristor starting device includes: a converter which converts AC power supplied from an AC power source into DC power; a DC reactor which smooths a DC current; an inverter which converts the DC power provided from the converter into AC power, and supplies the AC power to a synchronous machine; a gate pulse generation circuit which generates a gate pulse to be provided to thyristors of the converter and the inverter; a control unit which sets a phase control angle of the gate pulse to be provided to the thyristors of the converter, by controlling a current of the converter such that the DC current flowing into the DC reactor matches a current command value; and an abnormality detection unit which compares a detection value of the DC current with the current command value, and determines an abnormality in the gate pulse based on a comparison result.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TMEIC CORPORATION1-1 KYOBASHI 3-CHOME CHUO-KU TOKYO 104-0031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ando, Akinobu Chuo-ku, JP 18 49
Hosokawa, Yasuhiko Chuo-ku, JP 31 229
Ogino, Hiroshi Chuo-ku, JP 99 641
Okuyama, Ryota Chuo-ku, JP 9 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00