Method for producing porous polyimide film, porous polyimide film and separator using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9911955
APP PUB NO 20170187021A1
SERIAL NO

15334767

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a porous polyimide film comprises: forming a first un-burned composite film wherein the first film is formed on a substrate using a first varnish that contains (A1) a polyamide acid or a polyimide and (B1) fine particles at a volume ratio (A1):(B1) of from 19:81 to 45:65; forming a second un-burned composite film wherein the second film is formed on the first film using a second varnish that contains (A2) a polyamide acid or a polyimide and (B2) fine particles at a volume ratio (A2):(B2) of from 20:80 to 50:50 and has a lower fine particle content ratio than the first varnish; burning wherein an un-burned composite film composed of the first film and the second film is burned, thereby obtaining a polyimide-fine particle composite film; and a fine particle removal step wherein the fine particles are removed from the polyimide-fine particle composite film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO OHKA KOGYO CO LTD150 NAKAMARUKO NAKAHARA-KU KANAGAWA KAWASAKI-SHI 211-0012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asai, Takahiro Kanagawa, JP 300 3450
Sugawara, Tsukasa Kanagawa, JP 19 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00