Surface-treated steel sheet for battery containers, battery container, and battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9911948
SERIAL NO

14627902

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a surface-treated steel sheet for battery containers. The surface-treated sheet is used to form a battery container for a battery. The battery uses a nonaqueous electrolytic solution as an electrolytic solution. The surface-treated steel sheet is characterized by the features as below. The surface-treated steel sheet includes a base material made of steel and an iron-nickel diffusion layer formed by performing thermal diffusion treatment after forming a nickel plating layer at least on a surface of the base material to be located at the inner surface side of the battery container. The iron-nickel diffusion layer has an outermost layer of which a ratio of Ni and Fe is 7.5 or less as a molar ratio of Ni/Fe. The iron-nickel diffusion layer has a thickness of 0.6 μm or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO KOHAN CO LTD2-18-1 HIGASHI-GOTANDA SHINAGAWA-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horie, Shinichirou Kudamatsu, JP 22 37
Tomomori, Tatsuo Kudamatsu, JP 34 185
Yoshioka, Koh Kudamatsu, JP 40 120

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00