Solar cell metallization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9911875
SERIAL NO

14260272

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An interdigitated back contact solar cell is provided. The solar cell comprises a solar cell substrate having a light receiving frontside and a backside comprising base and emitter regions. A first level metal (M1) layer is positioned on the substrate backside contacting the base and emitter regions. A second level metal (M2) layer is connected to the first level metal (M1) layer and comprises a base busbar and an emitter busbar. The first level metal comprises substantially orthogonal interdigitated metallization and substantially parallel interdigitated metallization positioned under and corresponding to the base and emitter busbars on the second level metal (M2). The substantially parallel interdigitated metallization of M1 collects carriers of opposite polarity of the corresponding busbar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OB REALTY LLC19900 MACARTHUR BLVD 12TH FLOOR IRVINE CA 92647

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deshpande, Anand Milpitas, US 26 356
Kapur, Pawan Milpitas, US 72 1111
Kommera, Swaroop Milpitas, US 7 54
Moslehi, Mehrdad M Los Altos, US 307 13906
Saraswat, Vivek Milpitas, US 6 175
Su, Yen-Sheng Milpitas, US 3 75

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00