Process for manufacturing a semiconductor substrate, and semiconductor substrate obtained

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9911641
SERIAL NO

14372659

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for manufacturing a semiconductor substrate, characterized in that it comprises providing at least one donor semiconductor substrate comprising at least one useful silicon layer; inspecting the donor substrate via an inspecting machine in order to detect whether the useful layer contains emerging cavities of a size larger than or equal to a critical size, said critical size being strictly smaller than 44 nm; and manufacturing a semiconductor substrate comprising at least part of the useful layer of the donor substrate if, considering cavities of a size larger than or equal to the critical size, the density or number of cavities in the useful layer of the donor substrate is lower than or equal to a critical defect density or number.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOITECBERNIN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boedt, Francois Meylan, FR 6 11
Brun, Roland Varces, FR 1 2
Butaud, Eric Grenoble, FR 6 4
Ledoux, Olivier Grenoble, FR 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00