Metrology target identification, design and verification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9910953
SERIAL NO

14356551

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metrology design and verification framework is provided, which includes methods and systems for metrology structure identification in an integrated circuit design data block, design rule checking, hierarchal design of metrology target structures to minimize random errors, and metrology design rule verification of metrology target design files. In-die metrology targets are identified using various filtering methods and/or designed as hierarchical structure within dies or outside the dies. Particularly, metrology target design files are generated, which are hierarchical in structure and compatible with design rule checks. Design rule check takes into account the hierarchical and often repetitive target designs in the verification process. Layouts may be verified using design rule checks at different levels of design rules, which may be combined to remove rule violations and errors prior to actual target production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KLA-TENCOR CORPORATIONONE TECHNOLOGY DRIVE MILPITAS CA 95035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adel, Michael Zichron Ya'akov, IL 46 1696
Chang, Ellis Saratoga, US 32 1401
Dror, Chen Tivon, IL 4 30
Shusterman, Tal Haifa, IL 3 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00