Shear test device and test method of rock mass discontinuities under constant normal stiffness condition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909966
SERIAL NO

15658334

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a shear test device and test method of rock mass discontinuities under constant normal stiffness condition. The device includes: a base used for placing a test piece; a loading framework fixedly connected with the base; a shear loading system used for applying a shear force to the test piece; a normal loading system used for applying a normal pressure to the test piece; a normal displacement monitoring system used for measuring the magnitude of normal displacement of the test piece in real time; and a computer control system used for receiving the data of the normal displacement of the test piece in real time, and constantly adjusting the normal pressure applied by the normal loading system to the test piece according to the principle that the normal stiffness of the test piece is unchanged.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY266590 NO 579 BAY ROAD QINGDAO ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE SHANDONG QINGDAO CITY A FOLK ART FORM POPULAR IN SHANDONG 266590

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiang, Yujing Qingdao, CN 10 7
Wang, Gang Qingdao, CN 1411 9119
Wu, Xuezhen Qingdao, CN 8 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00