Preparation device for preparing a sample of textile fibers, in particular cotton fibers, applicable to analysis and/or measuring apparatuses for analyzing and/or measuring characteristics of the textile fibers forming said sample

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909965
SERIAL NO

15334709

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A preparation device prepares a sample of textile fibers, in particular cotton fibers, applicable to analysis and/or measuring apparatuses respectively for analyzing and/or measuring characteristics of the textile fibers forming the sample. The preparation device includes a comb body that can be coupled in a sliding manner along a rectilinear guide that faces a perforated plate against which to press a mass of textile fibers forming protuberances projecting from the holes of the perforated plate. The comb body is arranged to grip tufts of textile fibers from such protuberances. The preparation device also includes at least one brush that is mounted in a sliding manner along a rectilinear guide facing the perforated plate and that is arranged to brush the textile fibers forming the protuberances before the comb body grips the tufts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MESDAN S P AITALY MILAN MILAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Musesti, Fabrizio Roe Volciano, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00