Wavelength converting device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909750
SERIAL NO

15386379

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wavelength converting device includes a heat dissipating member, a wavelength converting member, and a connecting member. The wavelength converting member is disposed on the heat dissipating member and contains a fluorescent material and a holding body including aluminum oxide, magnesium oxide, zirconium oxide, lutetium oxide, titanium oxide, chromium oxide, tungsten oxide, divanadium pentoxide, molybdenum trioxide, sodium oxide, yttrium oxide, silicon dioxide, boron oxide, or diphosphorus pentoxide. The connecting member contains a metal material and connecting the heat dissipating member and the wavelength converting member. The wavelength converting member includes an upper surface, side surfaces, and a lower surface. The connecting member is thermally connected to the side surfaces and the lower surface of the wavelength converting member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NICHIA CORPORATION491-100 OKA KAMINAKA-CHO ANAN-SHI TOKUSHIMA 774-8601

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawamata, Jun Tokushima, JP 12 70
Kosugi, Takao Anan, JP 5 153

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00